Sign in to follow this  
Followers 0
spyda308

SI 10-75

1 post in this topic

Date: 5/9/06

Time: 21:39

Location: Box 352, 265 beeman st x henderson

Frequency: 154.1900

Units Operating: E-152, E-156, TL-79, Sat. 5, Sq 1, Res5, Batt 22, Batt 21, D-8

Description Of Incident: fire in Pd

Writer: Spyda313

21:39- Batt. 22, 10-84, 10-75, All hands, fire in PD.

21:40- 156 is 4th engine,L78 fast, Batt. 21 All hands cheif. Sq-1 Responding.

21:42- Batt 22, Progress report 1:exposures- 1 street 2 side yard 3 rear yard 4 side yard, fire in 2nd floor rear of occupied 20x40 PD, Primarys Negative. 2 lines Stretched.

21:44: Div 8- 10-84.

21:45: Div 8 progress report #2 is as follows: 2 lines streched, 1 in operation, primarys negative, secondarys negative, fire k/d, still doubtful.

21:54: Div 8- 10-8 SQ-1, Eng.152 +Sat. 5.

21:55- Div 8- fire p/w/h.

21:56: Div 8- Fire under control.

21:59: Div 8- !0-41 code 1

22:06- Batt.21 10-8

Edited by spyda313

Share this post


Link to post
Share on other sites



Guest
This topic is now closed to further replies.
Sign in to follow this  
Followers 0

  • Recently Browsing   0 members

    No registered users viewing this page.