Sign in to follow this  
Followers 0
BFD1054

Vails Gate (Orange) - Working Fire - 08-12-12

1 post in this topic

Date: 08-12-12

Time: 2218hrs

Location: 30 Ricki Ln

Frequency: Base-5/OC911

Units Operating: VGFD Cars 1 (IC), 2 (op's), 3, 6, 7, E481, T482, E478, R480, T484, E479, City of Newburgh C4, E1 (FAST), New Windsor FD (stand-by), New Windsor PD, EMS & Fire Inspector

Weather Conditions: Warm

Description Of Incident: Working Fire in a type-II non-combustible commercial structure

Reporters: BFD1054, billy98988

2218hrs-Base-5 alerting Vails Gate; reported structure fire, caller see's fire in the building.

2220hrs-Base-5 re-sounding Vails Gate; confirmed structure fire as per PD units on the scene.

VGFD Car-1 arrived on scene, established Command and advised of a working fire in a single story commercial building.

Command then requested City of Newburgh FD to the scene as the FAST and New Windsor FD to stand-by for coverage.

E481 arrived, hooked a hydrant and laid into the driveway. Its crew then led off with an 1 3/4" line through a front door.

Truck-482 arrived and set-up on the #1 side. Its crew went to work checking for extension in the exposures which was (-) and started ventilation.

Truck-484 arrived and was positioned on the # 1/2 corner. Its crew assisted in ventilating the #2 exposures.

Crew's made a quick knock down of the fire, holding it to the area of origin.

As VGFD units took up, mutual aid was released.

Edited by BFD1054
JetPhoto, billy98988 and dashield like this

Share this post


Link to post
Share on other sites



Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
Sign in to follow this  
Followers 0

  • Recently Browsing   0 members

    No registered users viewing this page.